PRO - Grade Floor Standing AC 32A 7kw Industrial Use Charging Pile High Power Durable EV Charging Station

Customization: Available
Number of Charging Interfaces: One Pile with One Charge
Location: Private Use, Public Use

Product Description

1

Basic Information

Model NO.
AC Charging Stations
Installation
Floor-Standing
Charge Method
Quick Charge
Rated Input Voltage
220V, AC±20%
Rated Charging Current
32A
Efficiency
≥99%
Origin
China
Production Capacity
5000 Pieces/Year
2

Product Description

EV Charging Station
High Degree of Intelligence

Remote monitoring and management: With the help of the Internet of Things technology, users can remotely view the status of the charging pile through the mobile phone APP, such as charging progress, charging power, and estimated completion time.

High Security & Protection

Equipped with multiple protection mechanisms: overvoltage, undervoltage, overcurrent, leakage, and grounding protection. The system can quickly cut off power during abnormalities to protect vehicles and users.

Security Mechanism Compatibility Installation
Strong Compatibility

Suitable for a variety of models following unified standards (GB/T), compatible with major electric vehicle brands like Tesla, BYD, and NIO.

3

Technical Specifications

Product Version7kW Stand-alone / Smart Link
Rated Input Voltage220V AC±20%
Rated Charging Current32A
Protection ClassIP65
Flame Retardant RatingUL94-V0
Interactive ModeIndicator / Buzzer
Operating Temperature-30ºC ~ +50ºC
Networking ModeStandalone / Ethernet / 4G
4

Our Manufacturing & Certifications

Main Products

Our enterprise is a comprehensive national high-tech entity dedicated to the R&D, manufacturing, and service of electric equipment and charging pile infrastructure. Covering an area of over 15,000 square meters, we have obtained more than 200 patents and implemented digital management systems for our charging data platform.

Advantages Certifications Exhibition
?

Frequently Asked Questions

What are your terms of payment?
We support online fast payment and T/T (Telegraphic Transfer).
Do you test all chargers before shipping?
Yes, all major components are tested before assembly and each finished charger undergoes full functional testing before being shipped.
How long does it take to fully charge a car?
Charging time = Battery Capacity (kWh) / (Power of OBC or Charger, whichever is lower). For example, a 40kWh battery with a 7kW charger takes approximately 5.7 hours.
Are you a trading company or a manufacturer?
We are a professional manufacturer specializing in EV charging solutions with our own industrial park and R&D center.
Is the product suitable for outdoor installation?
Yes, our charging stations feature an IP65 protection rating, making them highly resistant to dust and water for safe outdoor use.
Does the charger support remote management?
The Smart Link versions support Ethernet and 4G connectivity, allowing for remote monitoring, status checks, and firmware upgrades.

Related Products